$refs.searchIdField.focus())">
#42055 · check availability
Apartment in a very nice locationclose to the St. Sava Temple. It is currently in the phase of final interior works. The building is of exceptional quality construction as well as the interior of the apartment. It will be luxuriously equipped. The expected time of moving in is March 2021.